OPERATION & MAINTENANCE SCHEDULE

AquaSHIELD enclosures are easy to install, and require minimal maintenance. Reference this inspection checklist before each cold season to ensure protection.

OPERATION & MAINTENANCE SCHEDULE DOWNLOAD

Before each cold season an inspection should include the following:

  • Ensure power is supplied to the heater and that the GFCI is working properly.
  • Inspect the position of the thermostat and set to the factory arrow marker or 40°F.)
  • Ensure proper operation of the heater. An ice cube on the sensor bulb is recommended.
  • A visual inspection for physical damage and leaks is recommended upon every visit.
  • Ensure proper operation of all locks, latches, and handles upon every visit.
  • Notify AquaSHIELD of any missing or damaged insulation panels.
  • Ensure proper operation of all accessories:
    • Strobe Lights
    • Wet Location Lights
    • Temperature Alarms
    • Exhaust Fans & Louvers
aqua shield enclosures